Tuoi Tre Newspaper newsroom, 2024. Actual photograph
Office interior design and build in Ho Chi Minh City
New offices, delivered on schedule.
SALA takes full responsibility from site survey, design and building management approvals to fit-out construction and warranty.
Book a free site surveyHotline +84 986 555 557
- One contractcovering all design and construction work
- Progress reportsdaily and weekly, with photos from the site and our workshop
- 24-month warrantyon structural works, 12 months on finishing works
- Tuoi Tre Newspaper
- Tu Du Hospital
- Cuu Long Pharma
- Becamex
- Lotte Legend Hotel
- ThangLoi Group
- Hung Loc Phat
- HTM
- CoAsian Coworking
- Vanthailand
- PiTC Group
- VOV
- Queen International Hospital
- The Rebirth
- Petrolimex
- Aswig
What SALA brings
to your business
Relocating or upgrading an office directly affects how a business operates. SALA keeps schedule, cost and quality under close control from the preparation stage.
A committed schedule
The construction plan is set at the outset, written into the contract and aligned with your lease handover dates, minimising extra costs caused by delays.
Single-point responsibility
SALA’s architects, engineers and skilled craftsmen work together from design through to completion. The client does not need to coordinate multiple contractors.
Transparent costs
A detailed estimate by work item and material type is prepared from the start, so you know and control the total cost before work begins. Alternative material options help optimise the budget, and every change is agreed in writing before it is carried out.
A space that reflects your brand
Layouts follow how your business actually operates, with attention to daylight, greenery, acoustics and healthy materials. Every space offers a positive experience for staff and partners and clearly expresses your brand.
Design and construction are delivered by the same team, ensuring the project is completed exactly as planned.
The lead architect follows the site through to acceptance, personally controlling materials, details and finish quality.
Featured project
Tuoi Tre Newspaper newsroom
SALA delivered the turnkey design and fit-out of the offices and studio for the Tuoi Tre Newspaper newsroom at 60A Hoang Van Thu, Phu Nhuan, Ho Chi Minh City.
- Area
- 640 m²
- Scope
- Interior design and fit-out
- Function
- Offices, studio
- Timeline
- 4 months
- Year
- 2024
Turnkey service from bare shell to move-in day
All work items sit under one contract, coordinated by one project manager who is accountable to you.
- Survey and space planning
- Site survey, review of how you operate, and proposals for the layout and headcount capacity.
- Design
- Concept design, 3D visuals, construction documents and a detailed estimate.
- Building approvals
- Preparing submissions and liaising with building management to obtain fit-out approval in line with building rules.
- Fit-out construction
- Ceilings, partitions, flooring, lighting and joinery made in our own workshop, coordinated with air-conditioning, fire protection and IT networks.
- Refurbishing occupied offices
- Phased, zone-by-zone works and out-of-hours scheduling so your operations are not interrupted.
- Handover and warranty
- Item-by-item acceptance and as-built documents; 24-month warranty on structural works and 12 months on finishes.
Our six-step process
- 01SurveySite survey, brief and target move-in date.
- 02Space planFunctional layout, seating capacity and design direction.
- 03Detailed design3D visuals, technical drawings and building submissions.
- 04Estimate and contractItemised estimate; schedule and quality committed in the contract.
- 05ConstructionDaily supervision and regular progress reports with site photos.
- 06Acceptance and handoverAs-built documents handed over and warranty honoured as committed.
Selected office projects
Projects SALA has designed and built for a newsroom, an international hospital and a coworking space.
What our clients say
“The digital newsroom designed and built by SALA is the heart and the new face of Tuoi Tre – a space that inspires our entire editorial team.”
“Throughout our collaboration, I was genuinely impressed by SALA’s professionalism and dedication, from design and construction through to completion. Despite a very tight schedule and market shortages of both materials and labour, SALA coordinated flexibly and managed the work effectively, handing over our project as committed with no compromise on quality.”
Frequently asked questions
For further information, please contact:
- Hotline0986 555 557
- Emailinfo@sala.com.vn
How much does office design and fit-out cost per m²?
Cost depends on the area, the building’s handover condition and the finish standard. After the survey, SALA provides a detailed itemised estimate with material options so you can choose what fits your budget.
How long does construction take?
It depends on the area, the level of finish and each building’s permitted working hours. The detailed schedule is set during the estimate stage and committed in the contract.
Does SALA deal with building management?
Yes. SALA prepares the design documents and method statements and works directly with building management to obtain approval before work starts.
Can an office be refurbished while it is still in use?
Yes. SALA divides the works into zones and phases and schedules noisy tasks outside working hours so your business is not affected.
What warranty applies?
Works carry a 24-month warranty on structural items and 12 months on finishing items, from the date of acceptance and handover.
Planning to relocate or expand your office?
Send SALA the building address, floor area and your target move-in date. We will survey the space and provide a preliminary layout free of charge.
